The delivery of heating
oil, needed two or three times a year, is a major event with the storage tank
being at the bottom of the garden, the tanker being parked on the road, and our
cottage sitting in between, with the only way for the 3” hose to get from one
to the other being through the house; preparation for the operation involves
clearing a hall passage of its resident clutter, laying a pair of thick old
curtains over a small carpeted area, unearthing from the barn and installing in
front of walls and doors, at a zig-zag in the route, two protective guards of
my own manufacture (old carpet nailed to a frame of 2x1 and still going strong
after 15 years), all of which takes several times longer than the 10 minutes or
so needed to actually pump the stuff in, after which it all has to be done in
reverse to get back to normality.
No comments:
Post a Comment